2022 Sportsman 352
Boat Name: "Change Order"
Change Order is a 2022 Sportsman 352 currently available for sale in Lantana Florida. This boat has a price of $389,000. Our team at Seattle Yachts is here to help you find the right boat for your needs, budget, and style. We have access to boats off the market that will never be seen online, so contact us today with your interest.
Price: $389,000
SPECIFICATIONS
Price: | $389,000 |
Boat Name: | Change Order |
Make: | Sportsman |
Model: | 352 |
Year: | 2022 |
Condition: | Used |
Category: | Center Consoles |
Construction: | Fiberglass |
Length: | 35 ft |
Display Length: | 35 ft |
Beam: | 11 ft 2 in |
Max Draft: | 2 ft in |
Min Draft: | -- |
Fuel Capacity (Gallons): | 330 |
Fuel Type: | Gas/Petrol |
Fresh Water Capacity (Gallons): | 35 |
Max Speed: | -- |
Displacement: | -- |
Number of Engines: | 2 |
Engine Make | Yamaha |
Engine Model | XF425NSA2 |
Engine Power | 569.93 HP |
City: | Lantana |
State: | Florida |
Country: | United States |
MORE INFO
For Sale: 2022 Sportsman 352 Center Console – Twin Yamaha 425s Low Hours and Extended Warranty
This 2022 Sportsman 352 is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425s with digital electric steering. Built for serious performance and all-day comfort, it blends innovative tech, high-end finishes, and serious fishability.
Electronics & Helm:
- Dual Garmin GPSMAP® 8622 MFD 22" displays
- Yamaha Command Link Plus CL7 touchscreen
- Garmin VHF 215 radio
- SeaStar Maximus digital switching
- Edson 13” stainless steel steering wheel w/ power knob
- JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
- Fusion® Apollo™ stereo + remote
- Airmar B175M CHIRP transducer
Fishing & Deck Features:
- Dual 30-gallon pressurized aquarium livewells
- Macerated in-deck fish boxes
- 6 flush-mounted gunwale rod holders
- Under-gunwale rod storage & bow storage
- High-speed livewell pickup & sea chest
- Dual side entry doors w/ removable boarding ladder
- Rear insulated cooler, built-in 65 qt. lounge cooler
Comfort & Layout:
- Triple premium captain’s chairs at the helm
- Rear-facing seat w/ sink
- Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
- Electric-actuated bow table/sun deck
- Wraparound bow seating w/ removable backrests
- Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
- Sileather® premium marine upholstery
Build & Utility:
- 355-gallon fuel tank
- 35-gallon freshwater tank w/ washdown
- Raw water washdown
- Trim tabs w/ LED indicators
- Onboard battery charging system
- Anchor windlass system w/ 400’ line
- Total Access bilge compartment w/ Seakeeper pod
- SportTech® vacuum infusion hull construction
- 10-year hull warranty
This 35’ center console is turnkey and ready for anything—whether you’re heading offshore or entertaining at the sandbar. Loaded with features, meticulously kept, and built to perform. Extended engine warranty
Seattle Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel
Electronics and Helm
Electronics & Helm:
- Dual Garmin GPSMAP® 8622 MFD 22" displays
- Yamaha Command Link Plus CL7 touchscreen
- Garmin VHF 215 radio
- SeaStar Maximus digital switching
- Edson 13” stainless steel steering wheel w/ power knob
- JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
- Fusion® Apollo™ stereo + remote
- Airmar B175M CHIRP transducer
Fishing & Deck Features
Fishing & Deck Features:
- Dual 30-gallon pressurized aquarium livewells
- Macerated in-deck fish boxes
- 6 flush-mounted gunwale rod holders
- Under-gunwale rod storage & bow storage
- High-speed livewell pickup & sea chest
- Dual side entry doors w/ removable boarding ladder
- Rear insulated cooler, built-in 65 qt. lounge cooler
Comfort & Layout
Listing MLS by Yachtr.com
SIMILAR BOATS